Did a car fire cause delays on the M25?

M25 Lorry Fire Causes Major Disruption

10/02/2021

Rating: 4.34 (11380 votes)

Motorists faced significant disruption on the M25 following a dramatic lorry fire that occurred on Sunday evening. The blaze, which engulfed a lorry between Junction 5 in Kent and Junction 6 in Surrey, led to prolonged road closures and severe traffic congestion, with delays extending for several hours into Monday. The incident not only impacted the M25 but also caused knock-on effects on other major routes, including the M26 and the Dartford Crossing.

How many fire engines & water carriers were there in Surrey?
Five fire engines and two water carriers were sent by Surrey Fire and Rescue Service to extinguish the blaze. Firefighters remained at the scene until around 8.40am on Monday, at which point the lorry was a blackened shell.
Table

The Inferno on the M25

The alarming incident unfolded around 10 pm on Sunday when a lorry, travelling clockwise on the M25, reportedly collided with a safety barrier before erupting into flames. Video footage captured the terrifying scene, showing the vehicle engulfed in an 'inferno' as it came to a standstill. The fire was so intense that it prompted other drivers to reverse their vehicles away from the danger. Witnesses described hearing loud bangs, believed to be exploding tyres, which further heightened the sense of alarm and caused people to retreat to their cars for safety.

Mike Heath, an HGV driver who was present at the scene, described the fire as an 'inferno'. "The flames were very fierce and the cars in front of me were reversing back once they realised how bad the fire was," he told the PA news agency. "There were lots of people standing outside of their cars videoing the incident when all of a sudden I heard two loud bangs which I believe could have been the tyres exploding, but it was loud enough for the people to rush back to their cars." Mr. Heath was stationary for over two hours as emergency services worked to contain the blaze.

Another witness, Simona Andreeva, recounted her experience: "Not long after I joined the M25 from (the) M23 was when I saw the lorry on the other side of the motorway on fire. It must have happened just moments before I stopped my car. (The) response from the emergency services was quick." She also noted the loud bangs emanating from the burning HGV, which led to instructions for drivers to move their vehicles further back.

Susan Nicholls, from Horsham, described hearing an explosion so loud it made her 'scream'. "Lots of people were getting out of their cars and walking up to the fire, but there were quite a few very loud explosions, so that sent people scurrying back to their cars," she said. "One explosion was so loud it made me scream. I think the emergency services did an amazing job. The fire was huge and they managed to put out the fire, clear the debris and clear a lane in two and a quarter hours, which I think is very good."

Emergency Response and Road Closures

Surrey Fire and Rescue Service responded swiftly to the incident, deploying five fire engines and two water carriers to tackle the blaze. Firefighters worked tirelessly to extinguish the fire, remaining at the scene until approximately 8:40 am on Monday. By this time, the lorry had been reduced to a blackened shell. National Highways confirmed that the vehicle had been extinguished, but the recovery process would require specialist equipment, and the road surface would likely need resurfacing.

Consequently, the clockwise carriageway of the M25 between Junction 5 (Kent) and Junction 6 (Surrey) remained closed for a significant period. National Highways warned that the closure was likely to persist for the rest of Monday, resulting in substantial delays of up to two-and-a-half hours, with congestion stretching for four miles. A diversion route was put in place, directing traffic via A-roads.

Wider Impact and Secondary Incidents

The lorry fire's impact extended beyond the immediate section of the M25. The M26 westbound was also closed between Junction 2A and the M25/A21 interchange, exacerbating travel difficulties for those attempting to navigate the area. This closure added further complexity to the already challenging journey for many.

Adding to the day's travel woes, a separate incident at the Dartford Crossing caused further disruption. The northbound east tunnel of the Dartford Crossing, connecting Kent and Essex, was also expected to remain closed throughout Monday. This closure was attributed to a breakdown of a maintenance vehicle, which resulted in a large spillage within the tunnel. Emergency resurfacing works were deemed necessary, leading to severe delays on all approaches to the crossing, with queues reported to be seven miles long. National Highways issued a statement advising motorists to allow extra time for their journeys due to the ongoing closure and significant congestion.

Did a car fire cause delays on the M25?
A car fire on the M25 clockwise before the Clacket Lane Services caused significant delays. The incident occurred in lanes one and two of the four-lane section, between Junction 5 (M26) and Junction 6 (Godstone). All lanes have since re-opened.

Key Information Summarised

Here's a quick overview of the key details:

IncidentLorry fire on M25
LocationM25 clockwise, between J5 (Kent) and J6 (Surrey)
Time of FireAround 10 pm on Sunday
InjuriesDriver sustained minor injuries
Emergency Services5 fire engines, 2 water carriers deployed by Surrey Fire and Rescue Service
Road ClosuresM25 clockwise between J5 and J6; M26 westbound between J2A and M25/A21
DisruptionDelays of up to 2.5 hours, 4 miles of congestion on M25; severe delays on approaches to Dartford East Tunnel

Frequently Asked Questions

Q1: What caused the M25 delays?
The primary cause of the delays was a significant lorry fire on the M25 clockwise carriageway between Junction 5 and Junction 6. This led to a prolonged road closure for safety and recovery operations.

Q2: Were there any injuries reported?
Yes, the driver of the lorry sustained minor injuries and received medical attention.

Q3: How many fire engines attended the scene in Surrey?
Surrey Fire and Rescue Service sent five fire engines and two water carriers to extinguish the blaze.

Q4: What was the extent of the disruption?
The M25 closure caused delays of up to two-and-a-half hours and four miles of congestion. The M26 westbound was also closed, and the Dartford Crossing experienced severe delays due to a separate incident.

Q5: When was the M25 reopened?
While the fire was extinguished by Monday morning, the road remained closed for recovery and resurfacing, with National Highways indicating it would likely stay closed for the rest of Monday.

Conclusion

The lorry fire on the M25 served as a stark reminder of the potential for severe disruption caused by such incidents. The coordinated efforts of the emergency services were crucial in managing the situation, but the consequences for road users were considerable. Motorists were advised to seek alternative routes and allow ample extra travel time, highlighting the importance of staying informed about traffic conditions, especially during major incidents. The combination of the M25 fire and the Dartford Crossing issues created a challenging day for travel in the South East.

If you want to read more articles similar to M25 Lorry Fire Causes Major Disruption, you can visit the Automotive category.

Go up